10 wind turbines on coastal defense

Building wind turbines on a hard seawall? That’s a challenge that requires precise planning, an integrated design, and a customized approach.

Integrated design for the foundation of 10 wind turbines on a dike

Commissioned by Rijkswaterstaat, Eneco is building Windpark Maasvlakte 2 with 22 wind turbines. Ten of these turbines will be installed on the dike that protects the hinterland from the sea. Due to the risks associated with working on a dike, we only carry out our seawall work outside the storm season. Therefore, the entire project must be completed between April 1 and October 1. This requires precise and complex planning for all parties involved.

Specifications

Project:

Windpark Maasvlakte 2 - Rotterdam

Commision:

Designing, supplying, and installing reinforced soil structures

Client:

Eneco i.o.v. Rijkswaterstaat

Contractor:

Ballast Nedam

Design:

Geologics

Supplier:

Joosten Concepts, Joosten Kunststoffen i.c.m. Solmax (TenCate)