Water management for residential neighborhood

To address water nuisance during heavy rainfall, the municipality of Tilburg constructed the Blauwe Ader Connection with an overflow facility. This allows excess rainwater to be captured in the future-proof pond.

Municipality of Tilburg makes Kromhoutpark pond more sustainable

The pond liner in Kromhoutpark, Tilburg, needed replacement after 19 years; a perfect opportunity to make the pond more sustainable. Together with the residents and Bureau B+B (responsible for the original 1991 design), the Municipality of Tilburg updated the park’s design.

Specifications

Project:

Renovation of Kromhout Park - Tilburg

Commision:

Supply and installation of prefab pond liner

Client:

City of Tilburg

Contractor:

Reyrink Aannemersbedrijf B.V.

Subcontractor:

Joosten Productie en Lastechniek

Supplier:

Joosten Productie en Lastechniek

Do you have a similar challenge?

Contact a specialist from Joosten Groep